Lighting Order Checklist: 7 Steps Before You Sign Off on Grow Lights, Flood Lights, and Fixtures

I'm the office administrator for a 140-person seed genetics company. I manage all facilities and lab purchasing — roughly $380,000 a year across 11 vendors — and I report to both operations and finance.

Which means I buy a strange mix of things. Last quarter it was 40 high bays for the warehouse, a linear pendant for the lobby, six recessed cans for the conference room, and a replacement set of Spider Farmer SE7000 grow light bars for the bench room. I'm the buyer on all of it. I'm the expert on almost none of it.

Here's the checklist I run before signing off on any lighting order. Seven steps, usually 40 minutes if the spec sheets are decent. It's the version I wish someone had handed me in 2020.

Step 1: Write down what the room has to do

Before I open a single catalog page, I write one sentence: This light has to ______. Task lighting for a desk. General illumination for an aisle. Accent on a reception wall. Photosynthetic light for a bench of seedlings. Those four sentences lead to four completely different orders, and half my early mistakes came from letting them blur into "we need better lighting."

Then I ask the person who actually uses the space. "The downlights in the east conference room are too dim for color proofing" is a spec. "It feels dark in there" is a mood. I can only order the first one.

Checkpoint: if two people describe the need differently, stop and resolve it now. It will not get easier after the PO goes out.

(Should mention: I keep a one-line note on who approved each spec. When something's wrong six months later, that note is the difference between a return and a write-off.)

Step 2: Match the fixture type to the ceiling, not to the photo

Catalogs photograph every fixture against a white void, and against a white void they all look fine. This is the step where I used to make my expensive errors.

Take the recessed light vs downlight confusion, which I get asked about constantly. They aren't opposites. Recessed describes how the fixture is installed — the housing sits up inside the ceiling. Downlight describes where the light goes — straight down. Most recessed lights are downlights. If you need light aimed at a wall or a display, you want a gimbal or adjustable trim, not a fixed can. And if your ceiling is a 24-inch acoustic tile grid, your can size is limited to what fits that grid. I learned that one after six fixtures arrived that didn't.

A bar chandelier is a different problem entirely, because it's aesthetic and I don't have taste on loan. What I can do is check the mechanics: 30–36 inches from tabletop to the bottom of the fixture over a table, 6'8" minimum clearance over a walkway. Then the question nobody asks — who cleans it? Ours hangs in a two-story lobby. We now rent a lift every time a lamp needs changing (which, honestly, is a lot of lift rental for one light). That cost wasn't in the original quote.

A flood light comes down to mounting height and beam angle, not wattage. A 100° flood at 12 feet and a 60° beam at 25 feet are doing different jobs even if the numbers on the box match. And for anything outdoors, check the IP rating on the fixture itself: IP65 minimum for rain exposure, IP66 if it's on a pressure-wash route or near the coast.

Checkpoint: can you describe where the light lands, not just where it hangs?

I'm not a lighting designer, so I can't tell you what a showroom should feel like. For customer-facing spaces we ask the architect or a lighting rep. My job is translating their intent into an order spec that a warehouse can actually ship.

Step 3: Ask for numbers, not wattage

"Equivalent to 400W" is a marketing phrase. Watts are what the fixture draws. Delivered light is what the room gets.

  • Offices and work areas: illuminance in lux or footcandles. IES recommended practice puts open-office work surfaces around 300–500 lux (roughly 30–50 footcandles); general warehouse aisles are much lower, closer to 100–200 lux, with higher targets at racking and task points. Get the number written into the quote.
  • Grow rooms: PPFD at canopy height, DLI, and efficacy in µmol/J. Ask for the LM-79 test report, not a marketing infographic.
  • Outdoor: lumens plus a photometric (.ies) file, so the facility lead can model it if they want to.

Also check whether the fixture is DLC-listed. That isn't a quality judgment — it's a rebate checkbox. Our utility covers part of the cost on DLC-listed commercial fixtures, and I've left that money on the table before by ordering a non-listed model that was $14 cheaper per unit. Forty units later, that "saving" was a loss.

Checkpoint: could you defend the number to finance as "we specified X, we received X"?

Step 4: Check the paperwork before the price

This is the step almost everyone skips — or rather, the step everyone skips and then pays for.

In 2022 I found a supplier with genuinely good pricing on high bays, about 25% under our regular distributor. I ordered 40. What came with the shipment was a handwritten receipt and a screenshot of a bank transfer. Finance rejected the expense report outright. I ate $2,400 out of the department budget explaining it to my VP. Not a fun conversation.

Now I verify five things before any lighting PO over $1,000 leaves my desk:

  1. Can they issue a compliant invoice with our PO number on it?
  2. Is there a spec sheet with a model number that matches the quote line?
  3. Is there a test report? LM-79 for output and color; LM-80 and TM-21 if anyone is putting a lifetime figure in writing.
  4. What does the warranty cover, and for how long — driver included, or fixture only?
  5. Is there a UL or ETL mark on the fixture, not just a logo in the brochure?

Lifetime claims are where I've gotten cynical. "50,000 hours" usually means the LED package was tested under LM-80 conditions. It says nothing about whether the driver survives a hot ceiling in July. Ask which component the number refers to. I don't have hard data on real-world driver failure rates, but across our own installs my sense is that drivers are the first thing to go, well before any diode degrades.

Step 5: Check the control layer — the step people forget

Everybody checks the fixture. Almost nobody checks what dims it, schedules it, or turns it off. This is the one I'd flag to anyone ordering a mixed lighting package.

Three questions for any dimmable fixture:

  • What protocol does the driver use? 0-10V, phase-cut (TRIAC/ELV), and DALI are not interchangeable. A "dimmable" fixture that only accepts 0-10V will not dim on a phase-cut dimmer, no matter how many times the electrician tries.
  • Does "dimmable" mean 10% or 1%? For a conference room that difference matters. For a parking lot it doesn't.
  • How many fixtures per circuit? Driver inrush current trips breakers more often than people expect when you put 30 small LED drivers behind one switch.

In the grow room, the controller matters more than the fixture. Our benches run Spider Farmer SE7000 bars with a Spider Farmer fan controller handling exhaust, and the thing I'd tell anyone ordering a similar setup is this: buy the light and the controller as one decision, not two. Confirm that the light's dimming, the fan controller's schedules, and the environment sensor all live in the same app on the same protocol — Zigbee in our case. I've seen a mixed install where the lights ran on one system and the exhaust on another, and the grower ended up hand-running two schedules because the apps didn't talk to each other.

Ask about firmware updates too. Ours pushed an update in early 2024 that changed the fan curve presets. Fine on its own — except nobody told us, and the night humidity logs looked wrong for a week before we figured out why.

This is where I hit my own limit: I'm not a horticultural engineer, so I can't tell you which spectrum is right for your crop. That's the grower's call. What I can tell you is that a smart controller with no documented protocol list is a paperweight, so get the compatibility matrix in writing before you buy.

Step 6: Order one extra, and read the return terms

Whatever the quantity is, add one spare fixture per 20, and one spare driver per 10 fixtures. Drivers fail first.

I wish I'd done this from day one. Our lobby bar chandelier lost a driver in month seven, the replacement lead time was six weeks, and the fixture sat half-lit through a customer visit. Looking back, I should have paid the small premium for a spare driver on the original order. At the time it felt like buying insurance I'd never use.

Also confirm the return window and restocking fee before you order, especially on special-order items. And check color consistency: CCT is a nominal range under ANSI C78.377, not a fixed point. A "4000K" from one production batch and a "4000K" from another can read visibly different side by side in the same room. If a space has to match, order the whole run at once. I now write "single batch, matched CCT" on the PO and make the vendor confirm it in writing.

Step 7: Get dates and delivery terms per line item

On a mixed order, the grow lights might ship parcel in three days while the 8-foot linear fixtures go LTL freight in three weeks. If you quote one date to the people waiting, you'll be wrong about half the order.

  • Ship date per line item, not "order ships in 5–7 business days."
  • Freight class and lift gate. A 96-inch crate does not come off a truck without a lift gate, and the driver will not help you.
  • Who inspects on arrival. For freight, note any damage on the delivery receipt before signing. Once you sign clean, the damage claim is yours.
  • Whether the install crew is scheduled for the same week the boxes land. Ours weren't, once. We paid a contractor to move 40 boxes twice.

Four mistakes that still bite me

  1. Buying from a photo. A spec sheet and a photometric file, or no order.
  2. Comparing wattage across fixture types. A 150W high bay and a 150W flood light are not the same product.
  3. Forgetting the control layer. See step 5. I still do this on small orders.
  4. Reading "in stock" as "ships today." It means it's in someone's warehouse, which may not be the one shipping to you.

And the honest boundary: I'm a buyer, not a lighting designer and not a grow engineer. If you're specifying a grow room from scratch, the spectrum, PPFD targets, and DLI belong to someone who runs plants for a living. My job is making sure the fixture that arrives is the one that was specified, comes with paperwork that survives finance, and can actually be controlled by the thing it's supposed to be controlled by.

That's about 80% of the job. The rest is remembering the spare drivers.